Handover snag list — what finish and paint defects do inspectors actually flag that I'd miss myself?
Taking handover of a new villa soon and I'll do a snag walk before I sign. I know to check the obvious stuff (doors close, taps run, AC cools), but I'm told the finish and paint defects are where developers cut corners and where owners miss things.
What do professional snagging inspectors actually flag on finishes — paint, tiling, gypsum, joinery — that an ordinary owner would walk straight past? And are there simple ways to spot them myself?
3 answers
The finishes are exactly where a rushed handover shows, and most of it is invisible until you know the trick to see it. What inspectors flag:
Paint & gypsum: - "Holidays" — thin or missed patches where the wall shows through, and roller marks / lap lines in a raking light. - Patchy sheen or bumps over filler where snag repairs were painted but not properly sanded/primed. - Cracks at corners and visible joint lines in gypsum board, especially where ceilings meet walls. - *How to spot it:* shine a torch along the wall at a shallow angle (raking light) — every roller mark, filler bump and missed patch jumps out.
Tiling: - Lippage — one tile edge sitting higher than the next, which you feel with a bare foot and see in raking light. - Hollow tiles — poor adhesion, so they'll pop later. *Tap across the floor with a coin or knuckle; a hollow 'drummy' sound = not bedded properly.* - Bad grout lines — uneven width, cracks, missing grout, or wrong colour; and awkward cut tiles shoved at edges instead of planned out.
Joinery, glass & aluminium: - Misaligned doors/wardrobes, gaps at skirting and architraves, and messy or missing silicone at wet edges. - Scratches on glass, and window/door seals that aren't seated.
*Also handy:* a small spirit level on floors and thresholds catches slopes and lippage fast.
Snag everything with photos and a location for each — a good snagging inspection documents it so the developer can't wave it off. If the list is long or the developer's dragging, having a finishing and snagging team do the report (and later the fixes) gives you a professional, itemised document that's much harder to ignore.
The raking-light trick is the single best tip here — we snagged our own place in normal daylight, signed off, then saw a dozen roller marks and filler bumps the first evening the low sun came through the window. Do the paint walk with a torch at night or early/late sun. Also photograph everything with a note of the room; a vague list is easy for the developer to dismiss.
The hollow-tile tap test saved us — three "perfect looking" floor tiles sounded completely drummy and popped within months in the units next door where people didn't catch it. Two minutes tapping across each floor. And check the grout colour matches room to room; ours had two different whites where they'd run out mid-job.
People also asked
- How do you switch maintenance providers without a gap in cover or losing service history?3 answersApartment & Office Renovation
- The developer is dragging on fixing my snags after handover — how does the defects-liability period actually work?3 answersApartment & Office Renovation
- Taking handover of a new-build villa — what must be on the snag list before I sign and pay?4 answersApartment & Office Renovation
- Business Bay office, months after the fit-out little things are showing up (doors, AC balance, snags), whose job is the aftercare?2 answersApartment & Office Renovation
- One handyman for everything, or separate specialist trades — when is a handyman actually the right call?2 answersApartment & Office Renovation
- How do you actually choose a reliable home maintenance company in Dubai without getting burned?2 answersApartment & Office Renovation
More in Apartment & Office Renovation
- Rain forecast after weeks of dust — what should I actually check around the villa before the first rain hits?3 answersApartment & Office Renovation
- Just got the keys to a Dubai villa — what do I sort with DEWA and check in the first week?3 answersApartment & Office Renovation
- Buying a resale villa in Dubai — what maintenance and condition checks should we do before we commit?3 answersApartment & Office Renovation
- Handyman versus a specialist trade in Dubai, when is a handyman enough and when do you need a licensed pro?2 answersApartment & Office Renovation
- Year-round home maintenance calendar for a Dubai villa, what should we service in each season?2 answersApartment & Office Renovation
- Is an annual home maintenance contract worth it in Dubai, and what should it actually cover and cost?2 answersApartment & Office Renovation